AOAC SPDS ERP DECEMBER 15, 2017
Approved methods from the ERP meetings are published in the OMA and in the Journal of AOAC INTERNATIONAL . Meeting overviews are published in the AOAC Inside Laboratory Management magazine.
5HSRUWV DQG 'RFXPHQWDWLRQ AOAC staff or designee will capture the decisions and action items into an ERP report.
The draft report will be sent back to the ERP Chair whose responsibility it is to sign off on the report once approved. The report is then distributed to the ERP.
ERP is responsible for a drafting a written recommendation to the OMB for each method at a maximum of two years following adoption as First Action OMA
Made with FlippingBook - Online magazine maker